Yes, and being a newer city changes what a Doral job usually looks like once we’re on site. The city incorporated in January 2003, roughly 29.7 kilometers from our Davie base, and the bulk of its housing followed after that date, not before it.
That timing matters for one specific reason: it puts most Doral construction after polybutylene supply piping had already left the market, so it isn’t the concern here that it can be in an older, mid-1980s Broward subdivision. Copper and CPVC are the more likely finds behind a Doral wall.
What we do plan around is the ground itself. Doral sits on flat, low-lying terrain that drains through a network of canals tied to the C-4 and C-6 basins, and heavy rain can outpace that drainage faster than it would on higher ground a few miles away.